Flow Coaster Trail

Flow Coaster Trail

Flow Coaster Trail Project Started: 2017 Lower Neverland from YBR to Rusty Muffler was opened in August 2016. Upgraded trail 100 meters and new trail construction 1355 metres? Project completed: 2019 Location: 3 Blind Mice Length of Trail: Approx 2 km (2000 metres)...
Neverland

Neverland

Lower Neverland Project Started: 2016 Lower Neverland from YBR to Rusty Muffler was opened in August 2016. Upgraded trail 100 meters and new trail construction 1355 metres? Project completed: 2016 Location: 3 Blind Mice Length of Trail: 2.754 km (2,754 metres)...
Neverland

Bronco Trail Upgrade

Bronco is a very popular trail that sits at the mid-southern end of the Three Blind Mice that has needed a number of upgrades for years now. The trail tread consists of silty dirt, shale rock in sections and bedrock in sections. Due to heavy use, steepness of trail,...